Tianjin Guoce Aerospace Technology Co., Ltd Testing Commission Form | Number: GCHT-2020 | ||
The 1 Page All in all; 1 Page | |||
Commission To Internal Rong Rong | 1. Inspection items and standard basis 2、 Sample situation Sample manufacturer Sample Name: Type Number Business Sample production date Provide the quantity of inspection samples 3、 Check progress, location, and collaboration matters □ If there are progress requirements, please submit them to Completed before □ No progress requirements, comply with laboratory arrangements for testing 4、 After the trial, the sample should be prepared according to the following steps: Ways to handle 1. Refund, to be made by the commissioning unit after the trial is completed Retrieve within days 2. Refund will be sent by the testing agency, and the required fees will be borne by the commissioning unit 3. Non refundable, handled by the testing agency in accordance with relevant sample management regulations Five The inspection results and reports shall be in accordance with the following: Ways to handle 1. Self pickup by the commissioning unit; 2. Mailed by the testing agency, and the required expenses shall be borne by the testing agency; 3. Directly provide the inspection results to the commissioning unit without issuing a report | ||
Client | Testing organization | ||
Unit name Mailing address Proxy Table Electricity Words Fax (or email) Post Editor Date of commission: YeaMonthThe day | Inspection fee Accounts receivable& nbsp; Yuan □ See settlement list Settlement based on actual expenses incurred Inspection Department: Sales representative:< Inspection issuance date:Year Month The day | ||
Note: If the address for sending reports or invoices is different from the address of the commissioning unit, please indicate it in this note column | |||
Please download the attachment and fill it out before returning it to our company(Attachment downloadable)